Linear infrastructure designed
Lines drawn to scale against each other.
We take infrastructure projects from need assessment and feasibility through the detailed project report, clearances and tender, and stay on as the design consultant until the project is built.
Most consultants hand over at the report. We carry the same survey data, engineers and design intent through every stage, so nothing is lost between the DPR and the site.
Pre-feasibility, options and alignment studies, demand assessment, preliminary costs and risks.
Topographic, airborne LiDAR, hydrographic, traffic and drainage surveys from our own fleet.
Analysis and planning, alignment and structural design, drawings, BOQ and cost estimates.
Forest and wildlife clearance and environmental impact assessment.
Detailed design and engineering, detailing, drafting and tender drawings.
Design support on site through construction, then structural audit and health monitoring.
Feasibility studies and detailed project reports across the sectors that move India.
Feasibility studies, assessment surveys, alignment, pavement and junction design.
Specialised, prestressed and long-span bridges, from concept to detailed design.
Feasibility studies and final location surveys for new lines.
Ports, harbours, jetties and inland water transport.
Airport design and aeronautical surveys.
Canals, dams and reservoirs, with drainage, catchment and hydraulic studies.
Tunnel design and alignment, landslide mitigation measures.
GIS-based master plans, local area plans and town planning schemes.
Containments, gas terminals, silos, chimneys and launch-pad structures.
Every stage closes with documents a reviewing authority can approve and a contractor can build from.
A DPR is only as good as the ground it is drawn on. Ours start from LiDAR and survey data we capture ourselves, so quantities and costs hold up when construction begins.
Lines drawn to scale against each other.
Including specialised bridges, from concept to detailed drawings.
Tell us the corridor, site or catchment. We'll scope the feasibility study and the DPR.
Start a feasibility study